Projects — Real Groundwater Intelligence. Verified Results.

Every project on this page was delivered 100% remotely — no site visits, no field equipment, no guesswork. Satellite intelligence only. From agricultural land in Telangana to a ski resort in Türkiye to coastal properties in Costa Rica — the methodology is the same. The results are on record.

⭐ FEATURED PROJECT 01 — INDIA

Telangana, India — Nizamabad District

Terraflow GPR

Field Detail

Location Laxmapur Village, Chandur Mandal, Nizamabad District, Telangana

Commissioned by Terraflow Solutions, Hyderabad

Produced by Aquafuture Solutions, S.L., Barcelona, Spain

Sector Agricultural

Status ✅ Completed

Delivery 48 hours — 100% remote

One cold recharging groundwater vein identified within the property boundaries. Surface and stagnant waters excluded. Focus on stable, long-term recharging veins only.

Parameter Finding

Vein type Cold recharging vein

Direction Southeast to Northwest

Target depth 200 metres

Fracture note Vein influence likelyencountered before 200m due to terrain fracturing

Sustainable flow per well 2¾ to 3 inch

Daily water potential 60 inch/day(pumping 20 hours)

Wells recommended 1 precision-positioned wel

Well specification 8-inch diameter drilling

Terraflow GPS

Exact drilling coordinates in WGS84 format · Google Maps link for contractor · General satellite overview · Detailed vein location map · 4 subsurface analysis maps · Full drilling specification and methodology notes · Issued by Aquafuture Solutions, S.L.

Parameter Detail

Vein depth 200 metres

Total drilling depth 210 metres (drill 10m below vein bottom to ensure full capture)

Target depth 200 metres

Flow 2¾ inch (2.1 litres/second)

Drilling method Rotopercussion rig with air (recommended)

Alternative method Tricone with mud — thorough mud cleaning required

Coordinates Withheld — provided directly to client

⭐ FEATURED PROJECT 02 — TÜRKIYE

Kayseri, Türkiye — Erciyes Ski Resort

Thermal Water Discovery That Defeated a €5 Million Failure

The challenge:

The Kayseri City Council approached Aquafuture to study an area containing a ski resort with multiple hotels. The goal — find thermal water to supply the resort's hotels with heating and develop thermal bath facilities for year-round tourism.

What the satellite found:

Two springs traversing the area — one cold vein and one thermal vein. Given the potential of the thermal vein, Aquafuture was asked to produce a GPS report marking the exact drilling coordinates.

Parameter GPS Report Finding

Vein type Thermal spring

Target depth 430 metres

Expected flow rate 57 m³/hour

Water temperature 53°C

Coordinates Exact GPS drilling point provided

What happened when they drilled:

The depth specified in the GPS report was reached. The well was flushed and flow rate measured — yielding exactly the expected results. The well is now operational, supplying thermal water to the resort's hotels.

The critical context — why this result is extraordinary:

Before Aquafuture delivered its drilling coordinates, the client disclosed that two previous wells had been drilled less than 1km north and less than 1km south of the Aquafuture coordinates — both in search of thermal water. One reached 2,400 metres depth. The other reached 2,500 metres depth. Both were completely unsuccessful. Total investment: €5 million euros. Zero result.

Aquafuture's well — drilled to 430 metres at the exact coordinates provided remotely from Barcelona — succeeded completely.

Outcome and recognition:

The discovery was publicised in local and regional publications. Turkish government officials and regional authorities visited the completed well site. Aquafuture's team — who had conducted all work remotely and had never visited the location before — were invited to meet local authorities in person to receive their gratitude.

Currently — 2025:

Kayseri City Council returned to Aquafuture in early 2025 requesting new GPS coordinates to expand thermal water production — supplying the remaining hotels and developing new thermal facilities. A second GPS report has been completed. Well 2 is currently under construction. Work is expected to complete by summer

Signed: Luis Castelló Turell, Technical Director, Aquafuture Solutions, S.L.

Field Detail

Client Kayseri City Council

Location Erciyes Ski Resort, Kayseri Region, Central Anatolia, Türkiye

Sector Government · Hospitality · Tourism

Status ✅ Well 1 — Completed & Operating · 🔵 Well 2 — Active (under construction)

GPR Study October 2022

GPS Report March 2023

Delivery 100% remote — all analysis conducted from Barcelona, Spain

⭐ FEATURED PROJECT 03 — COSTA RICA

Costa Rica — Nationwide Portfolio

6 of 7 Provinces. 80+ GPR and 35+GPS Studies. One Methodology.

Field Detail

Partner Pura Vida Drillings, S.A.

Coverage 6 of 7 provinces — San José, Alajuela, Cartago, Guanacaste, Puntarenas, Limón

Total studies 80+ GPR and 35+ GPS projects across Costa Rica

Status ✅ Completed studies + 🔵 Active ongoing

GPR Study 80+ GPR

GPS Report 35+ GPS

Delivery 100% remote — all analysis conducted from Barcelona, Spain

Costa Rica represents Aquafuture's most extensive single-country deployment outside of Spain — with 80+ individual GPR and 35 + GPS studies mapped across the national territory.

What the satellite found:

Two springs traversing the area — one cold vein and one thermal vein. Given the potential of the thermal vein, Aquafuture was asked to produce a GPS report marking the exact drilling coordinates.

Case in focus — GPR CR 16, San Juanillo, Guanacaste:

Parameter GPS Report Finding

Direction South to North

Target depth 240 metres

Sustainable flow per well 7 litres per second

Water temperature 55°C

Wells possible 2 wells

Maximum total flow 14 l/s

Daily water potential 1,000 m³/day (pumping 20 hours)

Field Detail

Partner Pura Vida Drillings, S.A.

Coverage San Juanillo village, Guanacaste Province, Costa Rica

Property type Coastal land parcel

What the satellite found:

Two veins identified — one cold, one thermal. Surface and stagnant waters excluded.

Thermal Vein:

Cold Vein:

Parameter GPS Report Finding

Direction East to West

Target depth 120 metres

Sustainable flow per well 2.6 litres per second

Well specification 10-inch casing

Wells possible 3 wells (avoiding coastline end to prevent seawater infiltration)

Maximum total flow 7.8 l/s

Daily water potential 560 m³/day (pumping 20 hours)

Signed: Luis Castelló Turell, Technical Director, Aquafuture Solutions, S.L.